cynamonc

Whole home remodel.

cynamonc
8 years ago
last modified: 8 years ago

We did a whole home remodel starting from the top (popcorn ceiling removal), right to the bottom (we even removed the toilets). We took out everything including some walls, doors, light fixtures, wall paper, tubs, sinks, cabinets, etc.) It took us 12 weeks to complete the project. My husband and I worked at the house ever day and we hired several professionals for specific jobs (electrical, plumbing, railing fabricator, flooring installer). It was a fun project and were able to stay within budget and we kept on schedule. We are delighted with the results and are loving our newly remodeled home. We got all of our ideas for the remodel from HOUZZ.

BEFORE = Stairs and railing.

AFTER - we took out the half walls and installed fabricated stair railings and we replace the foyer light fixture and replace white carpet with wood flooring.

BEFORE - Sunroom

AFTER - Sunroom - we removed the hot tub and all the sliding doors and windows and created a sitting room. This room has the best view in the house. It was a shame that it was virtually unusable for 20 years with a huge hot tub in the middle of it. We painted the old pine ceiling with a rich dark brown.

BEFORE - Living Room

AFTER - Living Room - We replaced the white carpet with tile and removed the wet bar by turning it into a shower for the powder room behind it so that now we have a full bathroom for our guests. We remodeled the stair railings, fireplace and opened up the space between the sunroom and living room by removing all the interior windows and sliding doors.


BEFORE - Fireplace

AFTER - We updated the fireplace by replacing the old black tile and enlarging the step at the bottom. We also installed dimensional tiles in the niches. We then took out the glass doors and old logs and installed modern glass rocks with a stainless steel burning tray.

Comments (42)