The Bosche Residence
This Job consisted of removing all wood 2x2 balusters and the trim around them and installing our PC4/1/ and PC6/1 in Old World Copper color. We touched up the stain on the bottom of the railing and installed a new trim piece on the bottom before installing the new balusters. This particular job was completed in 1 day.