Pace started by opening up the ceiling. He removed the existing ceiling structure to expose the main floor’s original floor joists and brought the ceiling height up to around 7 feet. The team considered finishing the soot-covered joists but ultimately just sanded them, retaining a link to the building’s history and saving some money
Pace started by opening up the ceiling. He removed the existing ceiling structure to expose the main floor’s original floor joists and brought the ceiling height up to around 7 feet. The team considered finishing the soot-covered joists but ultimately just sanded them, retaining a link to the building’s history and saving some money