Orange Kitchen Remodel 2

This open and airy Orange Park acres kitchen was challenging. The home features several large ceilings on the first floor and the adjoining dining room ceiling was nearly 10 ft. The client's wishes were to have the kitchen reflect the same volume as the other rooms. We achieved this by creating a coffered ceiling in the center of the kitchen. By doing so it kept us from having to replace all of the doors and window in the space as well as increasing cabinet height to accommodate larger ceilings. The use of glass fronted cabinetry was important as well to give the space a more open feel. The Wolf and Sub-Zero appliances are as much a part of the design as they are to the clients requirements for a trouble free cooking experience- especially during the holidays where the family gathers to enjoy the seasonal festivities. This Kitchen was featured as the Kitchen of The Month in the Orange County Resister Home edition.
Project Year: 2015
Project Cost: USD 1,00,001 - USD 1,50,000
Country: United States
PIN Code: 92867
Others who worked on this project: Bruce Colucci