Kashas Design | Build
Kashas Design | Build
Average rating: 5 out of 5 stars22 ReviewsView Profile

Camas Deck Renovation

Cable rail installed with cedar posts and top rail. Each hole was drilled precisely with a drill press from each side to avoid splintering the wood. At this corner on the left side we used a lag screw tensioner while the cable on the right went through the post.