User
User
Average rating: 3.7 out of 5 stars3 ReviewsView Profile

Stoke Newington, London, N16

Before was a concreted room all around (floor, ceiling, walls)... Installation of new flooring, basin, toilet, boxing, toilet pump, new plumbing works as no 1st fix plumbing present before, FF&E, Plaster boarded, taped and joined, plastered, 1st/2nd fix down lights and painted and decorated.