Stoke Newington, London, N16
Before was a concreted room all around (floor, ceiling, walls)...
Installation of new flooring, basin, toilet, boxing, toilet pump, new plumbing works as no 1st fix plumbing present before, FF&E, Plaster boarded, taped and joined, plastered, 1st/2nd fix down lights and painted and decorated.