Complete Bathroom Remodel Pt.3
This bathroom was completely built from the studs. Plumbing, electrical, and drywall were all needed to make this turn into an amazing bathroom. Everything was waterproofed and set made to last. The shower was completed with a retro subway tile look and a niche. (Painting was completed by customer at his request).