nishant_khandelwal67

timeline of building a house

hi, can someone please guide me on the steps of building a house, I have the layout ready and the permissions in place, when do I hire the person who does the electrical drawings, plumbing drawings, and interior designs, for now I just have the designer who has designed the layout. shall I hire them when the ground floor is done or when the entire structure is done.. kindly guide on the steps like when what things are to be done. thank you

Comments (6)