How long should a 5-inch-thick sand and cement base, installed on a co

We are installing 2x2 ft tiles on the sun-exposed top floor. The contractor applied a 5-inch sand and cement mix before laying the tiles. The next step is to apply epoxy grout after the drying period.
I would like to inquire about the recommended drying time before applying epoxy grout.
Currently, I am in India, where temperatures are in the high 30s°F. There is a possibility of rain within the next two days.
Any advice on this matter would be greatly appreciated.